Conditional probability in a quant interview
Use counts to see the effect of a low base rate on a noisy signal.
Wall Street Playbook ·
Worked case
A large move happens on 10% of days. A signal fires on 80% of large-move days and 20% of other days. In 1,000 representative days, expect 80 fires on the 100 move days and 180 on the 900 other days. Conditional on a fire, the probability of a move is 80 / 260 = 30.8%.
Interview follow-up
The signal improves the prior but false positives still outnumber true positives. If the prior move rate drops to 5% with the same conditional rates, the posterior becomes 40 / (40 + 190) = 17.4%. In an actual backtest, estimate these rates out of sample and separately check whether the trading payoff at that precision covers costs.
Quantitative Finance Interview Playbook
Get the complete guide when you’re ready for more practice.
Sale price $50.15 Original price $59